📍 Location: Las Lomas District, Piura Region – Northern Peru
⚙️ Processing Type: Industrial Gold Processing Plant (Planta de Beneficio) – Flotation and Hydrometallurgical Recovery System
🔬 Processing Principle: Multi-stage mineral processing combining crushing, grinding, flotation and CIP leaching to maximize precious metal recovery from oxide and mixed gold mineralization
🔄 Operational Cycle:
Ore Reception → Crushing → Grinding → Flotation → Concentrate Recovery → CIP Leaching → Final Gold Recovery → Tailings Management
🛠️ Processing System:
Industrial comminution and beneficiation circuit including:
• Crushing and grinding stages
• Forged steel ball milling system
• Flotation cells with selective reagents
• Hydrometallurgical recovery line (CIP expansion stage)
• Industrial water handling and recirculation infrastructure
đź§Ş Metallurgical Inputs:
Documented operational use of:
• Aerofloat 242
• Dithiophosphate 208
• Dithiophosphate 404
• MIBC
• Industrial grinding media (forged steel balls)
📊 Average Reported Metallurgical Performance:
• Feed grades observed: ~5.28–6.33 g/t Au
• Recovery range: ~87%–92%
• Industrial processing under controlled beneficiation conditions
🏠Current Authorized Capacity:
Up to 100 tonnes per day (TPD)
🚀 Expansion Target Capacity:
Up to 270 tonnes per day (TPD) through additional processing optimization and expansion of downstream recovery circuits
đź’Ž Primary Output:
• Gold concentrate (Au)
• Future production of doré bars under expanded hydrometallurgical configuration
♻️ Tailings Profile:
Controlled industrial tailings management integrated into authorized plant operations with planned recovery optimization and environmental compliance framework
🌱 Environmental & Operational Standards:
• Environmental authorization and processing permits in place
• Controlled industrial water management
• Regulated beneficiation operation
• Formalized industrial processing framework
• Traceable mineral processing and commercial documentation
📦 Commercial Model:
Third-party mineral processing (Maquila Model) with documented industrial service operations
đź’µ Current Processing Revenue Structure:
• Industrial processing fee model
• Documented reference processing price: approximately US$45 per tonne (historical invoiced processing services)
• Short operational turnover cycle designed to optimize working capital deployment
🏢 Client Profile:
Processing services oriented to external mining operators and small-to-medium mineral suppliers under formal beneficiation agreements
đź’Ľ Investment Profile:
Operating gold processing infrastructure with existing permits, industrial activity and scalable throughput expansion. Positioned as a cash-flow-generating processing business rather than an exploration-stage mining asset.
🏦 Funding Stage:
Private Structured Investment Round / Industrial Expansion Financing
đź’° Capital Target: US$3.0 Million
📌 Use of Funds:
• Expansion from 100 TPD to 270 TPD
• Completion and optimization of hydrometallurgical recovery line
• Working capital for mineral purchasing and processing cycles
• Increased operational throughput
• Industrial equipment and infrastructure enhancement
• Strengthening cash flow generation capacity
🤝 Allocation:
Strategic investors – private debt, structured finance and industrial growth capital
đź“‘ Overview:
The Royal Gold PerĂş Processing Plant is an operating industrial gold beneficiation facility located in Northern Peru and designed to process third-party mineral feed through flotation and advanced recovery systems. The project combines existing operational infrastructure, documented industrial consumption, active commercial processing services, and scalable expansion plans. Rather than relying on speculative mineral reserves, the investment thesis is based on processing capacity, operational cash flow generation, and industrial throughput growth, creating a platform suitable for structured financing and future asset-backed tokenization initiatives.